Outline
of Requirements
Enquiry
received from building consultants for pump station.
At this stage the consultant
or his client has generally made the decision
as to whether they wish to keep the pump station
privately maintained or adopted by the local Authority.
The requirements from the consultant
was for an Adoptable pump station to deal with
the foul water discharge from 63 domestic dwellings.
Pims
Pumps Proposal
The Sewers for Adoption document
details the basic requirements for adoptable systems,
which each Water Company has a tendency to add
to, with its own individual specification and
guidelines resulting in considerable confusion
over the level of equipment actually required.
The standard manner in which
quotations for pumping stations are generally
obtained by developers utilising competitive tenders
leaves them in the position of having to compare
several alternative offers with differing levels
of equipment, without knowing if the most ‘attractive’
quotation is actually fully compliant with the
particular specification required.
The tendency is for the client
to pick the lowest price irrespective of what
is included.
We include equipment to meet
the minimum requirements of the Water Authorities
addendum to the Sewers for Adoption document and
we quote all items that are potential requirements
and steelwork as optional extras.
This allows Pims allows Pims
to offer a competitive price whilst ensuring specification
compliance.
Supporting information is provided
with our quote such as typical performance curves
and Sewers For Adoption drawing.
Benefits
to Client
- As a company Pims meet the
requirements of the specification. Others bidding
may not and whilst the client may receive the
lowest bid from others initially, in the long
term they will pay more to bring the station up
to a standard the Water Authority are prepared
to adopt.
- Many of our Partnering clients
have been caught in this scenario and therefore
the benefits of the partnering process is more
apparent to them.