Case Study
Commercial Installation for large Exhibition Hall
Client
Large U.K. Exhibition Hall
Type of Installation
Commercial Installation

 

Outline of Requirements

Enquiry received from numerous civil contractors and then additional site data from consultants.

Station required to deal with combined foul and surface water and to discharge at a restricted rate.

Various solutions were put forward all based on installation within chambers constructed by others given that the combination of depth and discharge rate precluded the use of a packaged type chamber.

Design was refined on an ongoing basis to accommodate clients changing site levels and discharge requirements and equipment scope altered to meet clients required remote monitoring via Building management System.

Subsequent to order client decided to install pumps with a site constructed sectionalised tank and liaison undertaken between ourselves and tank manufacturer to ensure compatibility.

General Benefits to Client of Commercial Installation

Provides flexibility to accommodate any potential pump configuration and flows and in this particular instance allowed pumps to be installed in sectionalised tank due to existing access restrictions

In General
- Deeper and larger structures can be constructed

- Alternative designs of station can be used such as Dry well set ups, self priming pumps, positive displacement pumps

- Small nuisance water sumps can be accommodated.

 

   